-
Due
Sep 23, 2019 by
10:40am
-
Points
20
-
Submitting
a file upload
-
Available
Aug 25, 2019 at 2:05pm - Dec 23, 2019 at 10:40am
This assignment was locked Dec 23, 2019 at 10:40am.
Contains all layers, with tables and columns needed for further work.
Most data sets will be empty, except for the
- study area boundary, and the
- storm drain/sewer grate layer,
which should be complete
You should include topological rules in a topology
1569253200
09/23/2019
10:40am
Rubric
Can't change a rubric once you've started using it.
Title
You've already rated students with this rubric. Any major changes could affect their assessment results.
Title
Criteria |
Ratings |
Pts
|
This criterion is linked to a Learning Outcome
Description of criterion
threshold:
5 pts
|
5
to >0 pts
Full Marks
blank
|
0
to >0 pts
No Marks
blank_2
|
This area will be used by the assessor to leave comments related to this criterion.
|
pts
/
5 pts
--
|
This criterion is linked to a Learning Outcome
Description of criterion
threshold:
5 pts
|
5
to >0 pts
Full Marks
blank
|
0
to >0 pts
No Marks
blank_2
|
This area will be used by the assessor to leave comments related to this criterion.
|
pts
/
5 pts
--
|
Total Points:
5
out of 5
|