ESPM 4295W (001)
Optional post for final geodatabase - you must copy to lab drive in Z_FinalData, but can also submit here
Skip To Content
Dashboard
  • Login
  • Dashboard
  • Calendar
  • Inbox
  • History
  • Help
Close
  • My Dashboard
  • ESPM 4295W (001)
  • Assignments
  • Optional post for final geodatabase - you must copy to lab drive in Z_FinalData, but can also submit here
2019 Fall (08/12/2019-01/05/2020)
  • Home
  • Media Gallery
  • Modules
  • Library Course Materials
  • NameCoach
  • Student Rating of Teaching

Optional post for final geodatabase - you must copy to lab drive in Z_FinalData, but can also submit here

  • Due Dec 18, 2019 by 1:30pm
  • Points 100
  • Submitting a file upload
  • Available Aug 25, 2019 at 12am - Dec 21, 2019 at 11:59pm
This assignment was locked Dec 21, 2019 at 11:59pm.

You need to copy your final data to the class L Drive, ESPM4295_share\yourname subdirectory with an appropriatetly named subdirectory and geodatabases for your data (see instructions on the  Course Drupal web pages for naming conventions. 

This is a back up for you to post data, but for most of you, your geodatabase will be too large to fit, so you will have to copy out of it to submit in smaller GDBs, or individually. You don't need to do this if you submit to the shared lab directory

1576697400 12/18/2019 01:30pm
Please include a description
Additional Comments:
Rating max score to > pts
Please include a rating title

Rubric

Find Rubric
Please include a title
Find a Rubric
Title
You've already rated students with this rubric. Any major changes could affect their assessment results.
 
 
 
 
 
 
 
     
Can't change a rubric once you've started using it.  
Title
Criteria Ratings Pts
This criterion is linked to a Learning Outcome Description of criterion
threshold: 5 pts
Edit criterion description Delete criterion row
5 to >0 pts Full Marks blank
0 to >0 pts No Marks blank_2
This area will be used by the assessor to leave comments related to this criterion.
pts
  / 5 pts
--
Additional Comments
This criterion is linked to a Learning Outcome Description of criterion
threshold: 5 pts
Edit criterion description Delete criterion row
5 to >0 pts Full Marks blank
0 to >0 pts No Marks blank_2
This area will be used by the assessor to leave comments related to this criterion.
pts
  / 5 pts
--
Additional Comments
Total Points: 5 out of 5
Previous
Final version of Project Report