Week 8 Assignment: Map of maximum surface absorption
DueOct 31, 2022 by
10:40am
Points10
Submittinga file upload
Available
Sep 30, 2022 at 5:05pm - Jan 28, 2023 at 10:40am
This assignment was locked Jan 28, 2023 at 10:40am.
Submit a map that shows the maximum surface absorption layer, created from a combination of the buildings, landcover, and soils data.
Include the watershed boundaries (polygon unfilled), your scaled surface absorption data, and an image or ESRI map background around the outside. Include the usual map elements.
This area will be used by the assessor to leave comments related to this criterion.
pts
/
5 pts
--
Week 8: OPTIONAL Project Package of net rainfall workflow/data/model (note, THIS IS OPTIONAL) Week 8 Assignment: Flowchart of your maximum absorption/infiltration workflow