ESPM 4295W (001)
Week 13: Rain Garden Runoff Table and map
Skip To Content
Dashboard
  • Login
  • Dashboard
  • Calendar
  • Inbox
  • History
  • Help
Close
  • My Dashboard
  • ESPM 4295W (001)
  • Assignments
  • Week 13: Rain Garden Runoff Table and map
2022 Fall (08/10/2022-01/05/2023)
  • Home
  • Media Gallery
  • Modules
  • Library Course Materials
  • NameCoach
  • Student Rating of Teaching
  • Course Admin Tools

Week 13: Rain Garden Runoff Table and map

  • Due Dec 5, 2022 by 10:40am
  • Points 25
  • Submitting a file upload
  • Available Sep 8, 2022 at 12am - Dec 18, 2022 at 11:59pm
This assignment was locked Dec 18, 2022 at 11:59pm.

Turn in here both a table (Excel or similar spreadsheet) and map showing the rain gardens, with each rain garden identified by a unique ID, and a corresponding spreadsheet row with columns showing
1)the rain garden area,
2) water volume capacity in cubic meters (area x 0.5m depth),
3) water (cubic meters) generated from the area upstream (watershed) of the rain garden from a 0.5 cm storm, and
4) water in cubic meters generated from the area upstream (watershed) of the rain garden from a 2.5 cm storm.

1670258400 12/05/2022 10:40am
Please include a description
Additional Comments:
Rating max score to > pts
Please include a rating title

Rubric

Find Rubric
Please include a title
Find a Rubric
Title
You've already rated students with this rubric. Any major changes could affect their assessment results.
 
 
 
 
 
 
 
     
Can't change a rubric once you've started using it.  
Title
Criteria Ratings Pts
This criterion is linked to a Learning Outcome Description of criterion
threshold: 5 pts
Edit criterion description Delete criterion row
5 to >0 pts Full Marks blank
0 to >0 pts No Marks blank_2
This area will be used by the assessor to leave comments related to this criterion.
pts
  / 5 pts
--
Additional Comments
This criterion is linked to a Learning Outcome Description of criterion
threshold: 5 pts
Edit criterion description Delete criterion row
5 to >0 pts Full Marks blank
0 to >0 pts No Marks blank_2
This area will be used by the assessor to leave comments related to this criterion.
pts
  / 5 pts
--
Additional Comments
Total Points: 5 out of 5
Previous
Next
Previous Module:
Week 12, Report Draft 3, Rain Garden and Pavement Mitigation
Week 13: Pervious surface map