Week 15 Assignment: Final version of Project Report
- Due Dec 22, 2022 by 11:59pm
- Points 200
- Submitting a file upload
- File Types pdf
- Available Sep 11, 2022 at 11:25am - Dec 23, 2022 at 11:59am
Turn in a pdf of your final project report.
Note that you must also turn in your final data, but NOT submitted here, rather copied to the class shared directory on the L Drive.
You copy your data to a subdirectory on the 4295Wshare drive that you create, with the folder name including your name and finalproject, e.g., PBolstadFinalProjectData.
Your data should be in two separate, "clean" geodatabases:
1) your original data, "as is," for your first set of runs. This data should contain the inputs, and your final output surface runoff layer. You should delete copies, duplicates, and intermediate layers.
2) a geodatabase as above, with modified input layers for mitigation of the 2.5 cm rainfall, and the surface runoff layer with a 2.5 cm rainfall. You should not include any of the original layers that have been modified, e.g., do not include the original canopy, original impervious surface layers, or unaltered buildings layer if you added green roofs. Also delete any intermediate layers.
The geodatabases should be named so I can distinguish them and include your initials, e.g., "PVB_base_data.gdb" and "PVB_2p5_storm_data.gdb", within your geodatabase.